Improving Solid Waste Management in the Greater Malé Region
15 October 2018
Author / Speaker

Approximately 774 tons per day of mixed waste is generated in Male’ and is sent to Thilafushi, an industrial island near Male’ with a 30-year-old dumpsite for waste. The geographic distribution of islands and lack of land makes the collection, transport of management of waste quite challenging and costly. Check out how Malé is responding to these issues and challenges through its improved solid waste management efforts.

Disclaimer

The views expressed on this website are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.

Topics

  • Environment